
We are delighted to announce that Cross Rail have ordered 4 new CMT multilevel borehole systems to support the site investigation process for the exciting new proposed rail route across London.The Continuous Multichannel Tubing (CMT) range chosen by Cross Rail allows detailed vertical sampling of complex groundwater environments. Specifically, hydraulic data is needed at several vertical intervals in relation ot the proposed tunnel route below Central London to investigate pore pressures and groundwater flow.
Waterra was chosen as the supplier of choice in this instance on the back of the successful trials of the CMT system over the last 2 years. It has proven to be the simplest and most economical multilevel system available for the collection of hydraulic data. It is currently being deployed at several locations on the Farringdon to Liverpool Street section of the Cross Rail route.
To find out more about our CMT capability come and talk to us at Waterra's stand, AWM115, at the Sustainabilitylive! event at the NEC Birmingham 19th-21st May 2009.
Waterra UK Ltd
Groundwater Monitoring Professionals
0 comments:
Post a Comment